|
Accession Number
|
NUREG/CR-7123
|
|
Title
|
Literature Review of the Effects of Smoke from a Fire on Electrical Equipment.
|
|
Publication Date
|
Jul 2012
|
|
Media Count
|
105p
|
|
Personal Author
|
D. C. Murphy P. A. Reneke R. D. Peacock T. G. Cleary
|
|
Abstract
|
A review is presented of the state of the art of smoke production measurement, prediction of smoke impact as part of computer-based fire modeling, and measurement and prediction of the impact of smoke through deposition of soot on and corrosion of electrical equipment. The literature review on smoke corrosivity testing and damage due to smoke deposition emphasizes (despite extensive research on smoke corrosivity) the lack of validated and widely applicable prescriptive or performance based methods to assure electrical equipment survivability given exposure to smoke from a fire. Circuit bridging via current leakage through deposited smoke was identified as a potentially important mechanism of electronic and electrical equipment failure during nuclear power plant fires. In the near term, assessment of potential damage can reasonably be based on the airborne smoke exposure concentration and the exposure duration. Hence, models that can predict the airborne smoke concentration would be sufficient to provide upper limit estimates of potential damage. In the longer term, it would be desirable to develop models that could estimate the deposition behavior of smoke, and specifically correlate the combination of deposited and airborne smoke to component damage.
|
|
Keywords
|
Airborne Corrosion Damage Deposition Electrical equipment Exposure(General) Fires Leakage Nuclear power plants Smoke Soot
|
|
|
Source Agency
|
Nuclear Regulatory Commission
|
|
NTIS Subject Category
|
77H - Reactor Engineering & Nuclear Power Plants 89 - Building Industry Technology 68A - Air Pollution & Control
|
|
Corporate Author
|
National Inst. of Standards and Technology (EL), Gaithersburg, MD. Engineering Lab.
|
|
Document Type
|
Technical report
|
|
Title Note
|
N/A
|
|
NTIS Issue Number
|
1226
|
|
Contract Number
|
N/A
|